Product Detail :
|
SELECTION OF EPC CONTRACTOR FOR SURVEY, DESIGN, ENGINEERING, SUPPLY, PROCUREMENT, INSTALLATION, ERECTION, CONSTRUCTION & COMMISSIONING OF GRID CONNECTED 116 MW (AC) SOLAR PV ALONG WITH 50.5 MW FOR 4 HOUR (MIN. 241 MWH) BATTERY ENERGY STORAGE SYSTEM POWER PLANT ON EPC BASIS WITH 10 YEARS OF OPERATION AND MAINTENANCE AT KAJRA, DIST., LAKHISARAI, BIHAR, INDIA
|